The supplied comparison records electricity use before and after two installations, together with each project’s projected annual reduction. The figures below reproduce the source table.

InstallationAnnual measureBeforeAfterExpected reduction
Metals company L · ASM120VT · October 2023Electricity (MWh/year)144.71103.6041.03
Energy equivalent (toe/year)33.1423.749.40
Laser company G · ASM50V · February 2024Electricity (MWh/year)84.7164.6320.08
Energy equivalent (toe/year)19.3914.804.59

The original shows no fuel quantity for either site. Reported reductions are reproduced as printed. Results depend on operating conditions.